Server Blades Reports

Eight Steps to Building a BladeSystem
sponsored by HPE and Intel®
WHITE PAPER: This guide explains the benefits of a converged infrastructure. It also explains the process of designing and implementing HP BladeSystem as well as a technical breakdown of this approach.
Posted: 02 May 2014 | Published: 28 Feb 2013

HPE and Intel®

IBM BladeCenter HS22 Product Guide
sponsored by IBM and Intel
WHITE PAPER: Read this Product Guide on the IBM BladeCenter HS22 reviewing the versatile, easy-to-use blade optimized for performance, energy and cooling.
Posted: 06 Jun 2011 | Published: 06 Jun 2011

IBM and Intel

Presentation Transcript: Methodologies and Technologies to Reduce Power and Cooling Demands in the Data Center
sponsored by Schneider Electric
PRESENTATION TRANSCRIPT: Access this exclusive resource to discover how server consolidation can lower data center energy bills by consolidating multiple servers on to fewer physical platforms.
Posted: 08 Jun 2011 | Published: 07 Jun 2011

Schneider Electric

Server Consolidation with IBM System x and BladeCenter Power by Intel Xeon Processors: Lowering Total Cost of Ownership
sponsored by IBM
WHITE PAPER: Read this case study and see how the latest IBM System x and BladeCenter servers powered with the new energy efficient Intel Xeon 5500 series processors offer tremendous opportunity for reducing energy consumption, shrinking your data center footprint and lowering operational costs.
Posted: 22 Oct 2010 | Published: 22 Oct 2010

IBM

Cisco UCS B230 M2 Blade Server: Uncompromised Virtual Desktop Performance
sponsored by VMware, Inc.
WHITE PAPER: When employing a virtual desktop solution, it is crucial to choose the right combination of hardware and software. This white paper introduces a comprehensive technology suite that can deliver uncompromised virtual desktop performance while using less than 5% of available bandwidth.
Posted: 20 Jan 2012 | Published: 20 Jan 2012

VMware, Inc.

Migrating from IBM POWER Server Silos to HP BladeSystem and Converged Infrastructure
sponsored by HP & Intel®
WHITE PAPER: This paper looks at the options IT managers have for hosting enterprise applications when replacing end-of-life POWER 4 or 5 servers. It compares an HP Converged Infrastructure, based on HP Integrity and Proliant server blades, to approaches based on IBM POWER. It also addresses customer options for business-critical application migration.
Posted: 09 Feb 2011 | Published: 09 Feb 2011

HP & Intel®

Doubling the Value of Virtualization with HP ProLiant G6 Servers and HP StorageWorks
sponsored by Hewlett Packard Enterprise
CASE STUDY: When Opus Interactive needed to provide customers with a cost-efficient, highly available pay-as-you-grow server and storage model, they turned to HP ProLiant server blades, the HP LeftHand P4000 SAN, and VMware. As a result there was 75% reduction in customer cost per server and higher availability.
Posted: 03 Mar 2010 | Published: 03 Mar 2010

Hewlett Packard Enterprise

Presentation Transcript - Improving Data Center Relations: IT Versus Facilities
sponsored by Viridity Software
PRESENTATION TRANSCRIPT: Today, IT resources can be provisioned quickly and cheaply—some would say too quickly and cheaply. But those IT resources rely on brick and mortar as well as megawatts, which are abstracted from the IT department. This Webcast will identify pitfalls data center teams should avoid.
Posted: 18 Nov 2010 | Published: 18 Nov 2010

Viridity Software

Total cost of ownership (TCO) of Dell PowerEdge M710 and HP Proliant BL685c G5 blade solutions
sponsored by Dell, Inc. and Intel®
WHITE PAPER: Enterprises of all sizes are deploying or considering deploying blade systems as a way to consolidate resources and lower their total cost of ownership. Read this white paper to learn about the total cost of ownership (TCO) for the Dell PowerEdge servers.
Posted: 17 Nov 2010 | Published: 19 Mar 2009

Dell, Inc. and Intel®

Understanding Desktop Virtualization
sponsored by Intel
WHITE PAPER: This white paper describes the variety of desktop virtualization models available, how each works, and the advantages and limitations of each model for key vectors such as security, manageability, and power consumption. Also identified are the major providers of software solutions and the end-point devices to deploy each model.
Posted: 14 Sep 2011 | Published: 13 Sep 2011

Intel